Projects

Geotechnical Investigation for LRT Extension

BACLARAN, MANILA

Client: Alstom

Date Completed: January 2021

​This was one of the most challenging projects when Teragrail started. The investigation was only limited to four (4) hours to avoid disrupting the daily operations of LRT. So the team had to set-up, drill and dismantle in this time span; not to mention all the safety preparations Teragrail had to go through since the Contractor was a foreign company.

Project - LRT.jpg
Teragrail Project - Zambales Powerplant.jpg

Technical Due Diligence Studies for a 283 MW Solar Powerplant

SAN MARCELINO, ZAMBALES

Client: PowerchinaHuadong Corporation and MIESCOR

Date Completed: Ongoing

TGG conducted a handful of studies for two (2) Clients for a solar powerplant in San Marcelino Zambales. This composed of the following: (1) Boundary and Topographic Survey Works; (2) Geotechnical Investigation/Drilling of Approximately 50 boreholes; (3) Bored Pile Consultation; (4) Ground Penetrating Radar Works; (5) Electrical Resistivity Works (Wenner); (6) Thermal Resistivity Survey; (7) Special Laboratory Works (triaxial tests, direct shear tests, consolidation tests, etc); (8) Geological Mapping Works, (9) Hydrology and Flood Studies for 25-yr, 50-yr, and 100-yr return period and, (10) Downhole Seismic Survey.

Geotechnical Investigation of 50 Boreholes

MANILA BAY, MANILA

Client: Cargon Mining Corporation

Date Completed: November 2021

The purpose of this investigation was to check for the suitability of the Manila Bay seabed to be used as backfill materials. TGG Mobilized two (2) barges, four (4) drilling teams, and two (2) drilling rigs for this project. The TGG team was able to complete this project in about four (4) months. The boreholes ranged from 10-m deep to 40-m deep. Continuous undisturbed drilling was done from 0.0-m to 15.0-m while SPT Sampling was done from 15.0-m to 40.0-m depth. This was a 24-hr operation.

Construction of Micropiles and Bored Piles for a Four (4) Storey Building

INTANDENCIA, INTRAMUROS, MANILA

Client: M.E. Sicat Construction Corporation

Date Completed: Ongoing

TGG is currently undergoing the construction of 40+ micropiles and 10+ bored piles for a four (4) storey building in Intramuros. TGG is responsible for all the drilling, welding, concrete pouring and jet grout works. Prior to the start of construction, TGG also conducted the Geotechnical Investigation and Evaluation for this project. In addition, TGG also conducted Ground Penetrating Radar works to check for underground utilities. This is for phase 1 works. TGG will also be commissioned to do the micropile and bored pile construction works for phase 2 which entails about 500 micropiles and bored piles in the area.

Teragrail Project - Intramuros Construction.jpg
Teragrail Project - Geothermal Powerplant.jpg

Geotechnical Investigation, Evaluation, and Design Works for a Geothermal Powerplant

LOCATION CONFIDENTIAL

Client: First Balfour Inc.

Date Completed: February 2022

TGG conducted detailed engineering design of (1 Ground Improvement Works using Stone Columns up to 15.0-m depth, the (2) Mechanically Stabilized Earth Retaining Walls and (3) Civil Design Works. TGG also conducted the geotechnical investigation and evaluation of the TanawonOHTL and PP-SY Areas of the powerplant.

Start Your Project Today! 

Project 1.2.jpg

Geophysical, EGGAR, Geotechnical Evaluation of Training Center

MATAAS NA BAYAN, LEMERY, BATANGAS

Client: Steel Asia

​

Scope: Geophysical Survey, Geotechnical Evaluation & EGGAR

Project 2.2.png

Offshore Port Geotechnical Investigation Project

MABINI,BATANGAS

Client: Woodfields Inc.

 

Scope: Offshore Drilling and Testing

Project 3.2.png

Magarayap Hydroelectric Powerplant Project

BACNOTAN, LA UNION

Client: National Irrigation Administration

​

Scope: Pre-Feasibility Study & Geotechnical Investigation

Project 3.png

Nickel Laterite Nickel Exploration Project

CANTILAN, SURIGAO DEL SUR, MINDANAO

Client: Camposo Mining Inc.

​

Scope: Drilling, Assay and Exploration Works

Project 5.1.png

2.3 Hectare Socialized Housing Project

MALVAR, BATANGAS

Client: YCP Properties Inc.

​

Scope: Borehole Drilling, Resistivity Survey & Design

Project 6.1.jpg

Geotechnical Evaluation and EGGAR for Amaia Cabuyao 2

AMAIA, CABUYAO, LAGUNA

Client: MDC Build Plus, Inc. (MDCBP)

 

Scope: Geotechnical Evaluation & EGGAR

Project 7.2.png

Technical Due Diligence Study for Morrison Heights

AMAIA, MANILA

Client: Vista Land

​

Scope: Topographic/Relocation Survey, Existing Uitlities, Hydrology, Flood, EGGAR

Project 9.1.jpg

Geotechnical Investigation for MGPC 500 kV TL Project

MARIVELES, BATAAN

Client: MIESCOR

​

Scope: Geotechnical Investigation & Evaluation

Stay Up to Date on Our Latest Project Experiences

Follow us on Facebook and LinkedIn for the latest news and updates on what we're up to.

  • Facebook
  • LinkedIn
Projects_Banner.jpg
Hero Image_Home-min.jpg

Bring Your Project to Life!

Are you experiencing challenges with a new or ongoing project? Do you have any questions or clarifications with anything related to ground, soil, or rocks? Get in touch with us and we'll answer for you!

Inquire Now

Thank you for contacting us!

We will get back to you as soon as possible.

INQUIRE NOW
bottom of page